About the Project:
441 Morgan is the latest tower situated in the Cambridge Crossing (CX) development. Also, known as parcel U this state of the art lab/office building spans 12 floors and 75,000 square feet, 5 outdoor terraces and anticipates a LEED Gold & WiredScore Platnum certification.
Scope of Project:
Draper completed another project within the Cambridge Crossing Development which was a total of nine (9) custom elevator interiors. These cabs feature wood veneer side wall panels and ceilings, with a beautiful Cambridge Architectural metal mesh rear wall. The handrails and all other metals, including the front wall (doors and swing COP’s) are a custom oxidized bronze finish